25FMVU4727
- Large High-Speed Motorboat type 300 (SSMB type 300)
Kvalificeringsannons
ny
Sista dag för ansökan 2026-03-05, annonsen visas mellan 2026-01-20 och 2026-03-05. Utförandeort Sverige, Östra Sverige, Stockholm, Stockholms län, Östra Mellansverige, Uppsala län, Södermanlands län, Östergötlands län, Örebro län, Västermanlands län, Södra Sverige, Småland och öarna, Jönköpings län, Kronobergs län, Kalmar län, Gotlands län, Sydsverige, Blekinge län, Skåne län, Västsverige, Hallands län, Västra Götalands län, Norra sverige, Norra mellansverige, Värmlands län, Dalarnas län, Gävleborgs län, Mellersta Norrland, Västernorrlands län, Jämtlands län, Övre Norrland, Västerbottens län, Norrbottens län.
The Swedish Defence Materiel Administration (FMV) has been commissioned by the Swedish Armed Forces (SwAF) to procure a
Large High-Speed Motorboat type 300, referred to as SSMB type 300.
The boat will replace several existing boat types within Naval Home Guard Battalions and Naval Combat Service Support,
becoming a standardised boat within the Swedish Armed Forces. SSMB type 300 is a boat intended for transportation of
personnel (up to 12 persons) and/or goods, surface surveillance and nautical education. It is intended for service in service area
C along the coast of Sweden. Service area C is in general defined by a distance of 5 nautical miles from shore.
The contractor shall be responsible for the construction and production of the boat and its relevant systems such as propulsion
machinery, electrical systems and navigational systems. The contractor shall also be responsible for the production of relevant
documentation (ILS) such as vessel operation manual (VOM), maintenance plans and product and provisioning data. In addition,
the contractor will be responsible for work in the areas of IT and information security as well as system safety.
The scope of the procurement is as follows:
- A contract of the construction and production of a pre-series boat SSMB type 300 including ILS documentation, IT and
information security, system safety and training.
- A framework agreement regarding series production of SSMB type 300, including spare parts.
- A framework agreement regarding spare parts, technical support and training.
When the pre-series boat is approved, the framework agreement regarding series production enters into force. The maximum quantity under this framework
agreement is 50 boats, with an option for an additional 25 boats.
The framework agreement shall be valid for an initial term of three (3) years. FMV shall have the right, but is not obliged to
extend the framework agreement additional two (2) + two (2) years. Total years of the framework agreement regarding series
production is seven (7) years, total years of the framework agreement regarding spare parts, technical support and training is ten (10) years.